
Description
Level 1.3 acre rectangle lot approved for three split. Views of south mountain. Quiet street adjoining residential subdivision. Engineer has been paid and is finishing everything should be complete within 30 days. attaching herein fire hydrant plan, storm water management plan, striping plan and the grading plans; which, have been approved 2/7/23.sewer plan still under review, review should be done soon paving plan received conditional approval, pending the final plat approval and street light clearance. Site plan is also on hold waiting for the final plat to be approved before re-submit. included the final plat documents, submitted the first time, (and copied the surveyor) per your request.Sincerely,Manuel a. inurriaga P.E., MSCEM&M Civil Engineeringmanuel@m-mcivile
-
0BEDS
-
1.32ACRES
-
0BATHS
-
01/2 BATHS
School Ratings & Info
Description
Level 1.3 acre rectangle lot approved for three split. Views of south mountain. Quiet street adjoining residential subdivision. Engineer has been paid and is finishing everything should be complete within 30 days. attaching herein fire hydrant plan, storm water management plan, striping plan and the grading plans; which, have been approved 2/7/23.sewer plan still under review, review should be done soon paving plan received conditional approval, pending the final plat approval and street light clearance. Site plan is also on hold waiting for the final plat to be approved before re-submit. included the final plat documents, submitted the first time, (and copied the surveyor) per your request.Sincerely,Manuel a. inurriaga P.E., MSCEM&M Civil Engineeringmanuel@m-mcivile
